Soil Stack Air Test Certificate Template dashboard preview

Dashboard preview from the delivered XLSX workbook

Back of pack

What is inside the download

Workbook tabsInstructions + Record
Live capacity40 records
FormatMacro-free XLSX
LicenceOne organisation

Product ID: CMT-JP-002 · Completed example and built-in instructions included.

Plumbing Records · UK digital download

Soil Stack Air Test Certificate Template

Editable, macro-free Excel workbook with sample data and formula-controlled exceptions

Create a clear record before soil stacks and above-ground drainage are boxed in. The workbook keeps each plot, stack or zone tied to the test method, readings, result, witness, photographs, and any remedial action.

Best for: Plumbing contractors, Housing developers, Site managers witnessing tests, MEP quality teams
£15GBP
One-time payment in GBP · Editable XLSX workbook · No subscription
30-day money-back guaranteeSecure Stripe checkoutInstant download after payment

Secure Stripe Payment Link

Pay in GBP through Stripe. After payment, Stripe sends you directly to the editable XLSX workbook download.

Browse all products
Under 2 minutes to checkout Commercial project use included

This product has a fixed GBP price. Any tax due is calculated by Stripe for the customer location.

Instant XLSX downloadMacro-free workbookNo subscription

The moment you need it

Record the drainage test before the stack is boxed in

The first-fix drainage is installed and is about to be enclosed. You need a test record that a site manager can witness and that still identifies the exact stack or zone months later.

Project boundary: Enter the test method and acceptance requirements from the approved project specification. This template records the test; it does not tell an unqualified person how to carry it out.

Soil Stack Air Test Certificate Template
£15

Product specifications

Product ID / format
CMT-JP-002 · Editable macro-free XLSX
Compatibility
Microsoft Excel, Excel Online, Google Sheets import
Verified contents
Instructions, completed example and 40 live record rows
Delivery and licence
Direct post-payment workbook download; single-organization project use included

Exact workbook structure

See where every piece of information goes

The delivered file contains two focused tabs: instructions for setup and a working record with one completed example plus 40 blank live rows.

Workbook tabs

  • Instructions
  • Record

Record fields

Test date
Plot or area
Stack or zone reference
Test method
Test pressure
Start and finish times
Observed loss
Result
Witness
Defect and remedial action

Built-in workflow features

  • One row per plot, stack, or test zone
  • Start, finish, pressure, loss, result, and witness remain linked
  • Defect and remedial-action trail sits beside the original result

Why this is more than a blank checklist

  • Preserves the exact tested location after enclosure
  • Keeps witness and photograph references with the readings
  • Uses project-defined test criteria instead of hard-coded universal limits

What's Included

  • Editable air-test certificate workbook
  • Plot, area, stack and zone references
  • Pressure, start, finish and loss fields
  • Pass/fail and witness record
  • Photo and defect references
  • Completed example plus built-in instructions

Compatible With

  • Microsoft Excel
  • Excel Online
  • Google Sheets import

How to Use

Review the included instructions and project criteria before replacing the clearly labelled sample data.

  1. 1Download the XLSX workbook after Stripe confirms payment.
  2. 2Save the original, then create a separate copy for the project or property.
  3. 3Read the Instructions sheet and complete the project-identification fields.
  4. 4Replace the grey example with the first live record.
  5. 5Complete each record as the work proceeds, then save the issued project copy.

Use Cases

Plumbing contractors
Housing developers
Site managers witnessing tests
MEP quality teams

Who it is—and is not—for

Built for: Plumbing contractors, Housing developers, Site managers witnessing tests, MEP quality teams.

Not for: Teaching an unqualified person to pressure-test drainage or replacing the test method and acceptance criteria in the approved specification.

Evidence and boundaries

Technical references

These sources explain the record-keeping context behind this product. They do not make the workbook an approved form, and they do not replace the current project specification, manufacturer documents, risk controls, or competent judgement.

References reviewed for this page on 13 September 2026.

FAQs

Licence: The editable workbook is licensed for internal project use by one purchasing organization. Redistribution, resale and source sharing with another organization are prohibited.

Refunds: 30-day money-back guarantee on all purchases. If the workbook is materially not as described or you are not satisfied, contact us within 30 days. Refund Policy

This workbook organizes project records. It does not provide engineering, legal, safety or code-compliance advice and does not replace qualified review or sign-off.

Related Products

Cavity Tray Inspection Photo Record Template dashboard preview
Masonry QAExcel workbook

Cavity Tray Inspection Photo Record Template

Plot-by-plot Excel register for cavity trays, stop ends, laps, weep holes, cavity cleanliness, photographs, status, and close-out actions.

Best for: Brickwork contractors, Housing site managers, Clerks of works, Developer and warranty QA teams
Editable Excel system · 40 record rows
Instant XLSX download · No subscription
Ground-Floor Slab Pre-Pour Checklist UK dashboard preview
Concrete QAExcel workbook

Ground-Floor Slab Pre-Pour Checklist UK

Editable Excel checklist for DPM, insulation, reinforcement, service penetrations, photographs, open actions, owners, and close-out evidence.

Best for: Groundworks contractors, Site managers, Clerks of works, Housing and concrete QA teams
Editable Excel system · 40 record rows
Instant XLSX download · No subscription

Capture the soil-stack test while the installation is still visible

Create a clear test record for every stack or zone before enclosure, with readings, witness details, photos, and defect close-out in one place.

Browse all products